Process Runner GLSU v26.2
This section describes the enhancements and fixed issues for Process Runner GLSU v26.2, released in July 2026.
Enhancements
Processed row tracking in GLSU worksheets
Process Runner GLSU now automatically marks successfully posted rows as Processed in the first column of the worksheet. When the same worksheet is posted again, rows marked as Processed are skipped, preventing duplicate postings. For more information, see Enable Posted Doc Tracking.
[PR-12274]
Fixed Issues
Error when using Validate before Park/Post with custom fields
When the Validate before Park/Post option was enabled in Process Runner GLSU and the template included custom SAP fields, a Microsoft Visual Basic runtime error occurred during the validation step, preventing the document from being posted.
[PR-12300]
SAP connection failure during GLSU validation
During the GLSU validation process, the SAP connection failed with the error Connection did not complete.
[PR-12216]
Excel Stops Responding When Importing CSV File Into GLSU Template
When you imported a CSV file into a GLSU template, Excel stopped responding if the CSV file was missing a final line ending.
[PR-12187]
Excel closed unexpectedly when validating GLSU template with multiple sheets
When clicking the Validate or Park/Post button in a GLSU template that contained multiple sheets, Excel closed unexpectedly.
[PR-12468]
Download link for latest version